Trending: Anna University 8th Sem Results April 2014 May/June 2014 Time Table/ Internal Marks Calculate CGPA Online SSLC Results 2014 12th Result 2014

Test Footer 1

Sunday, September 9, 2012

CE2258 HYDRAULIC ENGINEERING LAB SYLLABUS | ANNA UNIVERSITY BE CIVIL ENGINEERING 4TH SEM SYLLABUS REGULATION 2008 2011 2012-2013

Latest: TNEA 2014 Engineering Application Status, Counselling Date, Rank List
CE2258 HYDRAULIC ENGINEERING LAB SYLLABUS | ANNA UNIVERSITY BE CIVIL ENGINEERING 4TH SEM SYLLABUS REGULATION 2008 2011 2012-2013 BELOW IS THE ANNA UNIVERSITY FOURTH SEMESTER BE CIVIL ENGINEERING DEPARTMENT SYLLABUS, TEXTBOOKS, REFERENCE BOOKS,EXAM PORTIONS,QUESTION BANK,CLASS NOTES, IMPORTANT 2 MARKS, 8 MARKS, 16 MARKS TOPICS. IT IS APPLICABLE FOR ALL STUDENTS ADMITTED IN THE YEAR 2011 2012-2013 (ANNA UNIVERSITY CHENNAI,TRICHY,MADURAI,TIRUNELVELI,COIMBATORE), 2008 REGULATION OF ANNA UNIVERSITY CHENNAI AND STUDENTS ADMITTED IN ANNA UNIVERSITY CHENNAI DURING 2009


CE2258 HYDRAULIC ENGINEERING LAB L T P C
0 0 3 2
OBJECTIVE
Student should be able to verify the principles studied in theory by conducting the experiments.
LIST OF EXPERIMENTS
1. Determination of co-efficient of discharge for orifice
2. Determination of co-efficient of discharge for notches
3. Determination of co-efficient of discharge for venturimeter
4. Determination of co-efficient of discharge for orifice meter
5. Study of impact of jet on flat plate (normal / inclined)
6. Study of friction losses in pipes
7. Study of minor losses in pipes
8. Study on performance characteristics of Pelton turbine.
9. Study on performance characteristics of Francis turbine
10. Study on performance characteristics of Kaplan turbine
11. Study on performance characteristics of Centrifugal pumps (Constant speed / variable
speed)
12. Study on performance characteristics of reciprocating pump.
TOTAL: 45 PERIODS
LIST OF EQUIPMENTS
1. Bernoulli’s theorem – Verification Apparatus - 1 No.
2. Calculation of Metacentric height
water tank - 1 No.
Ship model with accessories - 1 No.
3. Measurement of velocity
Pitot tube assembly - 1 No.
4. Flow measurement
open channel flow
(i) Channel with provision for fixing notches
(rectangular, triangular & trapezoidal forms) - 1 Unit
(ii) Flume assembly with provisions for conducting
experiments on Hydraulic jumps, generation of
surges etc. - 1 Unit
5. Flow measurement in pipes
(i) Venturimeter, U tube manometer fixtures like
Valves, collecting tank - 1 Unit
(ii) Orifice meter, with all necessary fittings in
pipe lines of different diameters - 1 Unit
(iii) Calibration of flow through orifice tank with
Provisions for fixing orifices of different shapes,
collecting tank - 1 Unit
(iv) Calibration of flow through mouth piece
Tank with provisions for fixing mouth pieces
Viz external mouth pieces & internal mouth piece
Borda’s mouth piece - 1 Unit
40
6. Losses in Pipes
Major loss – Friction loss
Pipe lengths (min. 3m) of different diameters with
Valves and pressure rapping & collecting tank - 1 Unit
Minor Losses
Pipe line assembly with provisions for having
Sudden contractions in diameter, expansions
Bends, elbow fitting, etc. - 1 Unit
7. Pumps
(i) Centrifugal pump assembly with accessories
(single stage) - 1 Unit
(ii) Centrifugal pump assembly with accessories
(multi stage) - 1 Unit
(iii) Reciprocating pump assembly with accessories - 1 Unit
(iv) Deep well pump assembly set with accessories - 1 Unit
8. Turbine
(i) Impulse turbine assembly with fittings
& accessories - 1 Unit
(ii) Francis turbine assembly with fittings
& accessories - 1 Unit
(iii) Kaplan turbine assembly with fittings
& accessories - 1 Unit

No comments:

Post a Comment

Any doubt ??? Just throw it Here...