Trending: Anna University 8th Sem Results April 2014 May/June 2014 Time Table/ Internal Marks Calculate CGPA Online SSLC Results 2014 12th Result 2014

Test Footer 1

Tuesday, November 6, 2012

CE2355 ENVIRONMENTAL AND IRRIGATION ENGINEERING DRAWING SYLLABUS | ANNA UNIVERSITY BE CIVIL ENGINEERING 6TH SEMESTER SYLLABUS REGULATION 2008 2011 2012-2013

Latest: TNEA 2014 Engineering Application Status, Counselling Date, Rank List
CE2355 ENVIRONMENTAL AND IRRIGATION ENGINEERING DRAWING SYLLABUS | ANNA UNIVERSITY BE CIVIL ENGINEERING 6TH SEMESTER SYLLABUS REGULATION 2008 2011 2012-2013 BELOW IS THE ANNA UNIVERSITY SIXTH SEMESTER B.E CIVIL ENGINEERING DEPARTMENT SYLLABUS, TEXTBOOKS, REFERENCE BOOKS,EXAM PORTIONS,QUESTION BANK,PREVIOUS YEAR QUESTION PAPERS,MODEL QUESTION PAPERS, CLASS NOTES, IMPORTANT 2 MARKS, 8 MARKS, 16 MARKS TOPICS. IT IS APPLICABLE FOR ALL STUDENTS ADMITTED IN THE YEAR 2011 2012-2013 (ANNA UNIVERSITY CHENNAI,TRICHY,MADURAI, TIRUNELVELI,COIMBATORE), 2008 REGULATION OF ANNA UNIVERSITY CHENNAI AND STUDENTS ADMITTED IN ANNA UNIVERSITY CHENNAI DURING 2009

CE2355 ENVIRONMENTAL AND IRRIGATION ENGINEERING DRAWING L T P C
0 0 4 2
UNIT I WATER SUPPLY AND TREATMENT 15
Design & Drawing of flash mixer, flocculator, clarifier – Slow sand filter – Rapid sand filter –
Infiltration gallery – Intake towers – Service reservoirs – Pumping station – House service
connection for water supply and drainage.
UNIT II SEWAGE TREATMENT & DISPOSAL 15
Design and Drawing of screen chamber - Grit channel - Primary clarifier - Activated sludge
process – Aeration tank & oxidation ditch – Trickling filters – Secondary clarifiers – Sludge
digester – Sludge drying beds – Waste stabilisation ponds - Septic tanks and disposal
arrangements – Manholes.
UNIT III IMPOUNDING STRUCTURES 10
Gravity dam, Tank Surplus Weir, Tank Sluice with tower road – Drawing showing plan,
elevation, half section including foundation details.
UNIT IV CANAL TRANSMISSION STRUCTURES 10
Aqueducts – Syphon Aqueducts – Super passage – Canal siphon – Canal Drops- Drawing
showing plan, elevation and foundation details.
UNIT V CANAL REGULATION STRUCTURES 10
Canal head works- Canal Regular – Canal escape- Proportional Distributors – Drawing showing
detailed plan, elevation and foundation.
TOTAL: 60 PERIODS
TEXT BOOKS
1. Modi, P.N., “Environmental Engineering I & II”, Standard Book House, Delhi – 6
2. Sathyanarayana Murthy “Irrigation Design and Drawing” Published by Mrs
L.Banumathi, Tuni east Godavari District. A.P. 1998.
3. Sharma R.K. Irrigation Engineering and Hydraulic Structures Oxford and IBH Publishing
co., New Delhi 2002.
REFERENCES
1. Peary, H.S., ROWE, D.R., Tchobanoglous, G., “Environmental Engineering”,
McGraw-Hill Book Co., New Delhi, 1995.
2. Metcalf & Eddy, “Wastewater Engineering (Treatment and Reuse)”, 4th edition, Tata
McGraw-Hill, New Delhi, 2003.
3. Garg S.K., “Irrigation Environmental Engineering and design StructuresI”, Khanna
Publishers, New Delhi, 17th Reprint, 2003.
4. Manual on Water Supply and Treatment, CPHEEO, Government of India, New Delhi,
1999
5. Manual on Sewerage and Sewage Treatment, CPHEEO, Government of India, New
Delhi, 1993.

No comments:

Post a Comment

Any doubt ??? Just throw it Here...